Our achievements concerning modular waste management facilities and buildings for industrial use

Construction of the Contres (41) waste collection center

Construction of the Contres (41) waste collection center

Client : SMIEEOM VAL DE CHER (41)

The SMIEEOM Val de Cher chose Modulo Béton® for the construction of his new waste collection center. The platform permits to put 12 dumpsters. Under the platform, 6 storage areas are dedicated to dangerous waste, electrical and electronic waste, batteries, neon bulbs, used oils, reuse, and staff material. 2 areas are empty, to store later some new kinds of waste. The installation of access doors under the upper platform in tunnel makes it possible to create sheltered deposit areas for users. A 36m² living space has been made for the collection waste center staff, and delivered in just one day , and 4 weeks for insulation, air-conditionning, …
Total duration to build the collection waste center : 6 months including only 6 weeks for all fittings delivered by Modulo Béton®.

Surface : 1 107m2

Number of blocks : 40 blocks 4.50x3x2.30m + 43 blocks 3x3x2m + 2 ramps 6x15m. Total = 103 blocks.

Number of dumpsters : 12

Staff living space : 8x6m. Useful surface 36m².
Additional equipment : rubble devices Dechetremie® and Gravagliss®, rotating shelves guardrail Tranquiliquai®, oils tank, devices for guiding dumpsters, wooden planks (to protect concrete walls against potential impacts from dumspters), entry box 5’…